Four precautions for industrial vacuum freeze-drying machine

2026-10-27

1. The material must be thoroughly pre frozen and vacuum pumping with liquid is strictly prohibited
The material should be completely frozen before entering the freeze-drying chamber, and the temperature should generally be 5-10 ℃ below the eutectic point of the material, presenting a hard solid state.
If the pre freezing is not sufficient and vacuum is applied, it is easy to cause bottle spraying, bubbling, collapse, material flushing, and also contaminate the cold trap and vacuum pump.
When loading, the materials should be evenly spread on the tray, and the thickness should not be too thick to avoid stacking too densely and affecting the sublimation efficiency.
2. Vacuum and heating should be controlled according to the process curve, and should not be subjected to sudden pumping or heating
Vacuuming should be carried out slowly, and the main sublimation stage should only be entered after the vacuum degree meets the process requirements.
If the temperature rises too quickly during the drying stage, the surface or interior of the material may melt or collapse; The temperature rise during the secondary drying stage should also be gradually carried out, and cannot be directly jumped to high temperatures.
During operation, it is necessary to continuously record the temperature of the cold trap, the temperature of the plate layer, the temperature of the material, and the vacuum degree. If any abnormalities occur, the machine should be stopped and checked in a timely manner.
3. To end freeze-drying, the vacuum valve must be closed first, and then the vacuum must be slowly broken
After freeze-drying, the vacuum valve should be closed first, and then the vent valve should be slowly opened or dry nitrogen should be filled to restore normal pressure.
It is strictly prohibited to release gas quickly, otherwise it may scatter materials, damage the vacuum gauge, and even cause the vacuum pump oil to suck back and contaminate the product.
After discharge, the packaging should be sealed immediately to avoid moisture absorption, oxidation, or deactivation of freeze-dried products.
4. The vacuum pump oil and sealing system should be regularly maintained
The oil level of the vacuum pump should be maintained at 1/2 to 2/3 of the viewing window. If the oil is cloudy, blackened, or emulsified, it should be replaced in a timely manner.
The cabin door sealing ring and pipeline sealing ring should be regularly cleaned and checked for aging and cracking, and if necessary, an appropriate amount of vacuum silicone grease should be applied.
After each use, defrost, drain, and clean the cold trap and chamber to avoid residue corrosion of the equipment or affecting the vacuum performance next time.

Contact Us

 

E-mail:

sales@syguanfeng.com

Tel: 
+86 15088506234

 

Address: 

South Industrial Park of Dongguan, Shangyu District, Shaoxing City,Zhejiang Province,China.

 

%E7%AC%AC%E4%B8%80%EF%BC%8C%E6%9C%80%EF%BC%8C%E4%BC%98%E7%A7%80%EF%BC%8C%E5%A2%9E%E5%BC%BA%EF%BC%8C%E4%B8%80%E6%B5%81

Sorry,当前栏目暂无内容!

您可以查看其他栏目或返回 首页

Sorry,The current column has no content!

You can view other columns or return Home

Get

A Quote

Leave us a message and get access to exclusive offers, product updates, and expert advice tailored just for you!

*is requiredl You can ask any questions in the company including products.Please ill in the correct contact infomation so that we can reply to youin time!

Submit
%{tishi_zhanwei}%